Monday Feb 13 5:00-9:00
Today I mainly worked on building the device that protect our motor if the automaton cast sideways. Collin and I worked on fabricating the lexan. We got it mounted that night. I cleaned by spark around the band saw and cleaning all the spread that was around and on it.

Wednesday Feb 15 6:00-8:00
Today I made a few covers to put over the electronics. roughly trimming had to be done so the ball could move up smoothly. I was able to come in that done easily. I left after sweeping the shop floor.

Thursday Feb 7:00-9:00
Today I helped Avery build a camera mount. It wasnt lightheaded to fabricate but I got it by the end of the night. I organized the wire area a little.

Saturday 12:45-5:00
On this day I mainly served for people by get tools and materials. I spent a lot of time grind screws to the correct length.

Order your essay at Orderessay and get a 100% original and high-quality custom paper within the required time frame.

It took a long time because the screws get actually hot. I ate and swept the floor.

Sunday 1:45-2:30
Arrived and cleaned pretty much. I helped adjust parts on the robot with Nolan and left.

Monday 12:30-4:45, 6:00-7:30
Mainly I worked on the sic switches for the bridge manipulator. I took a lot longer than it necessary to. At the end of the night we found that the robot didnt sine qua non the part I worked on. Oh well. I swept the floor.If you want to get a full essay, order it on our website: Orderessay